Structural Steel Fabricator
The Challenge

LOTTE Engineering & Construction approached JAMCO Steel Buildings following its success on the previous Power Generation IPP2 Al Qatrana Project to construct another successful Power Generation Station in East Amman. The challenge was to fabricate and construct the 3 main powerhouse buildings and ancillary buildings in a record time of 12 months from groundbreaking to operational function considering complete coordination between JAMCO Steel Buildings, Main Contractor LEC and the rest of the subcontractors.

IPP2 Al Qatrana Power Project

Leading PEB companies in Jordan
Pre Engineered Steel Buildings Jordan
The Solution

The 1st two steel columns were installed within 2 weeks of ground breaking ceremony, pictured here on November 15th 2012 to show the ethos of work – speed and quality

With Our “We Can Do” Approach we transformed our operations of design, detailing, fabrication and construction management, to a nothing is impossible attitude to serve our Client’s main goal of completing the project with highest quality, within budget and most importantly On Time.

63 Days

of ongoing site work and fabricated steel continuously delivered from our factory.”2nd January 2013″

Pre Engineered Steel Buildings Jordan
Pre Engineered Steel Buildings Jordan
100 days

after ground breaking

15 Months

and on schedule.

Pre Engineered Steel Buildings Jordan
The Results

The World’s Biggest Tri-Fuel Cycle Power Generation Plan in the Hashemite Kingdom of Jordan, a 573MW Plant, Powered by 38 Wärtsilä 18V50DF multi-fuel engines, We delivered structural steel works, acoustical and fire rated building cladding, fireproofing works and generator exhaust fan duct systems in a record time. We changed the mindset of our team’s approach; enabling us to complete the project and handover the within only 26 months from ground breaking to the last installed piece of steel.

“JAMCO Steel Buildings scope of work throughout October 2009 till August 2011 for IPP2 and September 2012 till November 2014 for IPP3 Projects were fabricated and constructed in a timely manner, retained to all project durations and master schedules. JAMCO Steel Buildings professionalism, product quality and safe team work attitude with LOTTE E&C was highly admirable and to our utmost satisfaction. The certificate of completion was issued on 3rd November 2014 where all works were handed over to LOTTE E&C and the client and are in full operation”

Jae Hak Back

Construction Director

LOTTE E&C